Fact Field Value Latest Entry Date
2028b67cd157d14d151b283d4427ab669e335afb9c0a535fa6d7cb078b74e7c3 notes RR/2017/460/P - Redevelopment of site with terrace of 5 houses. A preliminary risk assessment based on a Site walkover survey and a desk study has indicated that the environmental risks associated with the site were low, and that a further intrusive site investigation was not required. This assessment is based on all materials currently stored on site being removed. The former stables are likely to contain droppings from pigeons and other vermin, which will present a health hazard to demolition workers, and must be removed in a controlled manner. Wooden doors and other items are probably coated with lead paint. Careful control of dust during demolition will be necessary. It is recommended that an asbestos survey of the buildings be conducted prior to demolition. On removal of the demolition rubble and existing floor slabs, it is recommended that the Site soils be inspected and photographed for signs of undetected on site contamination, particularly of oil spills. December 2021 - The site has commenced development and therefore an end date will be added on completion. December 2022 - the site is still under construction. 2022-10-01
4e0c68cc891c03e600e74f9825bf69874bbe9d0e2471ee3a359aca4a539711db notes RR/2017/460/P - Redevelopment of site with terrace of 5 houses. A preliminary risk assessment based on a Site walkover survey and a desk study has indicated that the environmental risks associated with the site were low, and that a further intrusive site investigation was not required. This assessment is based on all materials currently stored on site being removed. The former stables are likely to contain droppings from pigeons and other vermin, which will present a health hazard to demolition workers, and must be removed in a controlled manner. Wooden doors and other items are probably coated with lead paint. Careful control of dust during demolition will be necessary. It is recommended that an asbestos survey of the buildings be conducted prior to demolition. On removal of the demolition rubble and existing floor slabs, it is recommended that the Site soils be inspected and photographed for signs of undetected on site contamination, particularly of oil spills. December 2021 - The site has commenced development and therefore and therefore an end date will be added on completion. 2021-10-01
84c27d865b39ce47393a63e81da6ca008026fc58bddd8fe086e3da65b76786e1 notes A preliminary risk assessment based on a Site walkover survey and a desk study have indicated that the environmental risks associated with the Site were low, and that a further intrusive site investigation was not required. This assessment is based on all materials currently stored on site being removed. The former stables are likely to contain droppings from pigeons and other vermin, which will present a health hazard to demolition workers, and must be removed in a controlled manner. Wooden doors and other items are probably coated with lead paint. Careful control of dust during demolition will be necessary. It is recommended that an asbestos survey of the buildings be conducted prior to demolition. On removal of the demolition rubble and existing floor slabs, it is recommended that the Site soils be inspected and photographed for signs of undetected on site contamination, particularly of oil spills.. Re-development of site with terrace of 5 houses. 2018-10-01
d141ae07079f603b14c08cfc6b4837aa3483b558654dadd34a085b0bbf65290f notes RR/2017/460/P - Redevelopment of site with terrace of 5 houses. A preliminary risk assessment based on a Site walkover survey and a desk study has indicated that the environmental risks associated with the site were low, and that a further intrusive site investigation was not required. This assessment is based on all materials currently stored on site being removed. The former stables are likely to contain droppings from pigeons and other vermin, which will present a health hazard to demolition workers, and must be removed in a controlled manner. Wooden doors and other items are probably coated with lead paint. Careful control of dust during demolition will be necessary. It is recommended that an asbestos survey of the buildings be conducted prior to demolition. On removal of the demolition rubble and existing floor slabs, it is recommended that the Site soils be inspected and photographed for signs of undetected on site contamination, particularly of oil spills. 2019-10-01
ee17c2e243faba55efcb28119e9b875b446db55bcc8fc6d276fe2998b91400c4 notes RR/2017/460/P - Redevelopment of site with terrace of 5 houses. A preliminary risk assessment based on a Site walkover survey and a desk study has indicated that the environmental risks associated with the site were low, and that a further intrusive site investigation was not required. This assessment is based on all materials currently stored on site being removed. The former stables are likely to contain droppings from pigeons and other vermin, which will present a health hazard to demolition workers, and must be removed in a controlled manner. Wooden doors and other items are probably coated with lead paint. Careful control of dust during demolition will be necessary. It is recommended that an asbestos survey of the buildings be conducted prior to demolition. On removal of the demolition rubble and existing floor slabs, it is recommended that the Site soils be inspected and photographed for signs of undetected on site contamination, particularly of oil spills. December 2020 - No change 2020-10-01