Fact

2028b67cd157d14d151b283d4427ab669e335afb9c0a535fa6d7cb078b74e7c3
Field Value
Fact 2028b67cd157d14d151b283d4427ab669e335afb9c0a535fa6d7cb078b74e7c3
Field notes
Value RR/2017/460/P - Redevelopment of site with terrace of 5 houses. A preliminary risk assessment based on a Site walkover survey and a desk study has indicated that the environmental risks associated with the site were low, and that a further intrusive site investigation was not required. This assessment is based on all materials currently stored on site being removed. The former stables are likely to contain droppings from pigeons and other vermin, which will present a health hazard to demolition workers, and must be removed in a controlled manner. Wooden doors and other items are probably coated with lead paint. Careful control of dust during demolition will be necessary. It is recommended that an asbestos survey of the buildings be conducted prior to demolition. On removal of the demolition rubble and existing floor slabs, it is recommended that the Site soils be inspected and photographed for signs of undetected on site contamination, particularly of oil spills. December 2021 - The site has commenced development and therefore an end date will be added on completion. December 2022 - the site is still under construction.
Entity RDCBLR0015
Earliest entry date 2022-10-01
Latest entry date 2022-10-01
Latest resource 00f96f7f604f4ac26903633857b1a019c01a82e5b17ca58b7163ec57bf4cc109
Resources
Entry Date Resource
2022-10-01 00f96f7f604f4ac26903633857b1a019c01a82e5b17ca58b7163ec57bf4cc109