Fact

4e0c68cc891c03e600e74f9825bf69874bbe9d0e2471ee3a359aca4a539711db
Field Value
Fact 4e0c68cc891c03e600e74f9825bf69874bbe9d0e2471ee3a359aca4a539711db
Field notes
Value RR/2017/460/P - Redevelopment of site with terrace of 5 houses. A preliminary risk assessment based on a Site walkover survey and a desk study has indicated that the environmental risks associated with the site were low, and that a further intrusive site investigation was not required. This assessment is based on all materials currently stored on site being removed. The former stables are likely to contain droppings from pigeons and other vermin, which will present a health hazard to demolition workers, and must be removed in a controlled manner. Wooden doors and other items are probably coated with lead paint. Careful control of dust during demolition will be necessary. It is recommended that an asbestos survey of the buildings be conducted prior to demolition. On removal of the demolition rubble and existing floor slabs, it is recommended that the Site soils be inspected and photographed for signs of undetected on site contamination, particularly of oil spills. December 2021 - The site has commenced development and therefore and therefore an end date will be added on completion.
Entity RDCBLR0015
Earliest entry date 2021-10-01
Latest entry date 2021-10-01
Latest resource d7d2fb5417f59f07574985cd3a2ca92678cf4ab57c5ff06f5760491e805917ed
Resources
Entry Date Resource
2021-10-01 d7d2fb5417f59f07574985cd3a2ca92678cf4ab57c5ff06f5760491e805917ed