Fact Field Value Latest Entry Date
14376d2cdfb065b16ebd9eb13c02538795bd25b27441c00afba989d7cb4db076 description The development shall be carried out in accordance with the submitted flood risk assessment (Flood Risk Assessment, Prepared by EWE Associated Ltd, Draft Report Rev0 April 2023) and the following mitigation measures it details: Finished floor levels shall be set no lower than 2.15 metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-02-25