Planning condition
Flood risk assessment
Field | Value | Fact links |
---|---|---|
Reference | U0111618 | Facts |
Prefix | planning-condition | Facts |
Name | Flood risk assessment | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Notes | Unique Condition | Facts |
Reason | To reduce the risk of flooding to the proposed development and future occupants | Facts |
Description | The development shall be carried out in accordance with the submitted flood risk assessment (Flood Risk Assessment, Prepared by EWE Associated Ltd, Draft Report Rev0 April 2023) and the following mitigation measures it details: Finished floor levels shall be set no lower than 2.15 metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"reference": "U0111618",
"prefix": "planning-condition",
"name": "Flood risk assessment",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000901,
"notes": "Unique Condition",
"reason": "To reduce the risk of flooding to the proposed development and future occupants",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment (Flood Risk Assessment, Prepared by EWE Associated Ltd, Draft Report Rev0 April 2023) and the following mitigation measures it details: Finished floor levels shall be set no lower than 2.15 metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.