Provenance
2 results
Fields:
notes
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
0446e2621dc14689d4ed380ab8903d68390a848ce462f0685e1e0ac9161bd830 | notes | Land allocated in Local Plan Part 2 for residential development | 2017-12-19 | |
32f021f72a6cc3781112ab11553dabaece15a5429338a056c574415c09f3cef6 | notes | Pre determination assessment may be required at technical details stage due to potential issues with noise, odour and light. Canal & River Trust require the following to be addressed at Technical Details Consent stage: structural integrity of the retaining wall to the canal, site layout to provide a positive waterside frontage and the setting of heritage assets, Eanam footbridge 103 and towpath access and improvements, ecological assessment, land contamination and pollution prevention to the canal. Also has outline planning permission for 88 bed care home. Erection of 88 no. bed care home | 2017-12-19 |