12
Field | Value | Fact links |
---|---|---|
Reference | 12 | Facts |
Prefix | brownfield-land | Facts |
Name | 12 | Facts |
Dataset | Brownfield land | no fact link |
Organisation | Blackburn with Darwen Borough Council | no fact link |
Start date | 2017-09-07 | no fact link |
End date | 2021-12-31 | no fact link |
Entry date | 2021-12-31 | Facts |
Typology | geography | no fact link |
Point |
POINT (-2.497157 53.741839)
|
Facts |
Notes | Pre determination assessment may be required at technical details stage due to potential issues with noise, odour and light. Canal & River Trust require the following to be addressed at Technical Details Consent stage: structural integrity of the retaining wall to the canal, site layout to provide a positive waterside frontage and the setting of heritage assets, Eanam footbridge 103 and towpath access and improvements, ecological assessment, land contamination and pollution prevention to the canal. Also has outline planning permission for 88 bed care home. Erection of 88 no. bed care home | Facts |
Hectares | 1.5 | Facts |
Deliverable | yes | Facts |
Site address | Clearance site, Stansfeld Street, Blackburn | Facts |
Site plan url | https://www.blackburn.gov.uk/sites/default/files/media/pdfs/12%20Clearance%20Site,%20Stansfeld%20St.pdf | Facts |
Ownership status | owned by a public authority | Facts |
Maximum net dwellings | 90 | Facts |
Minimum net dwellings | 45 | Facts |
Planning permission date | 2020-02-21 | Facts |
Planning permission type | full planning permission | Facts |
Planning permission status | permissioned | Facts |
Planning permission history | https://planning.blackburn.gov.uk/Northgate/PlanningExplorer/Generic/StdDetails.aspx?PT=Planning%20Applications%20On-Line&TYPE=PL/PlanningPK.xml&PARAM0=90851&XSLT=/Northgate/PlanningExplorer/SiteFiles/Skins/Blackburn/xslt/PL/PLDetails.xslt&FT=Planning%20Application%20Details&PUBLIC=Y&XMLSIDE=/Northgate/PlanningExplorer/SiteFiles/Skins/Blackburn/Menus/PL.xml&DAURI=PLANNING | Facts |
Available Code Snippets:
{
"reference": "12",
"prefix": "brownfield-land",
"name": "12",
"dataset": "brownfield-land",
"organisation-entity": "39",
"start-date": "2017-09-07",
"end-date": "2021-12-31",
"entry-date": "2021-12-31",
"typology": "geography",
"geometry": "",
"point": "POINT (-2.497157 53.741839)",
"entity": 1700358,
"notes": "Pre determination assessment may be required at technical details stage due to potential issues with noise, odour and light. Canal & River Trust require the following to be addressed at Technical Details Consent stage: structural integrity of the retaining wall to the canal, site layout to provide a positive waterside frontage and the setting of heritage assets, Eanam footbridge 103 and towpath access and improvements, ecological assessment, land contamination and pollution prevention to the canal. Also has outline planning permission for 88 bed care home. Erection of 88 no. bed care home",
"hectares": "1.5",
"deliverable": "yes",
"site-address": "Clearance site, Stansfeld Street, Blackburn",
"site-plan-url": "https://www.blackburn.gov.uk/sites/default/files/media/pdfs/12%20Clearance%20Site,%20Stansfeld%20St.pdf",
"ownership-status": "owned by a public authority",
"maximum-net-dwellings": "90",
"minimum-net-dwellings": "45",
"planning-permission-date": "2020-02-21",
"planning-permission-type": "full planning permission",
"planning-permission-status": "permissioned",
"planning-permission-history": "https://planning.blackburn.gov.uk/Northgate/PlanningExplorer/Generic/StdDetails.aspx?PT=Planning%20Applications%20On-Line&TYPE=PL/PlanningPK.xml&PARAM0=90851&XSLT=/Northgate/PlanningExplorer/SiteFiles/Skins/Blackburn/xslt/PL/PLDetails.xslt&FT=Planning%20Application%20Details&PUBLIC=Y&XMLSIDE=/Northgate/PlanningExplorer/SiteFiles/Skins/Blackburn/Menus/PL.xml&DAURI=PLANNING"
}
Loading...
© Crown copyright and database right 2024
Licensed under the Open Government Licence v.3.0.