Skip to main content
2343
Provenance

Filters

Field

1 selected

Field

Clear

4 results

Fields: notes
Fact Field Value Latest Entry Date
16845186b50d9322a5256fffb1d2cb315a866a7a3060a061b74dffab1275aceb notes Town centre site that is part occupied by existing buildings with the remainder being vacant. The main building is a 19th Century woollen mill that was later converted and extended to swimming baths, but has been vacant since relocation. There are also two-bungalows in situ. An initial application for a complex scheme involving part demolition of the baths, clearance of the 2 dwellings, and construction 45 apartments for 'later living', was permitted but lapsed (13/02289/FUL). A revised proposal has now been approved partial demolition of the former swimming pool and of 2 existing dwellings, and construction of 46 apartments (18/04200/FUL). This will result in 44 net additional homes on completion. The works include demolition of the main pool building but retention of the stone facade. Development now underway and landowner/developer has confirmed deliverability, with the whole block of apartments forecast to be completed in the same year (2022/23). 2021-12-17
24f7dadea7224c9df282d1d428ba6f4da086b887d6e4dff4f3d4856d0ce6185c notes Town centre site that is part occupied by existing buildings with the remainder being vacant. The main building is a 19th Century woollen mill that was later converted and extended to swimming baths, but has been vacant since relocation. There are also two-bungalows in situ. An initial application for part demolition of the baths, clearance of the 2 dwellings, and construction 45 apartments for 'later living', was permitted but lapsed (13/02289/FUL). A revised proposal has now been approved partial demolition of the former swimming pool and of 2 existing dwellings, and construction of 46 apartments (18/04200/FUL). This will result in 44 net additional homes on completion. The works would entail the demolition of the main pool building but retention of the stone facade. Development now underway and forecast for completion within the next 5 years. 2020-12-17
84eef15fbf1b4fb6193fc07e1d4bfc298cd9a6529899109096a236e2def27cb0 notes Redevelopment of former leisure facility in the town centre following clearance. Planning permission is in place for development of 45 sheltered housing units (43 net), with two existing dwellings also to be demolished as part of the scheme (13/02289/FUL). Despite this consent having been technically implemented, it is understood that this particular scheme will not be taken forward. However there is potential for an alternative development and it is understood that a new proposal is to be brought forward in due course. Indicative yield considered to reflect a higher density scheme, with flats/apartments appropriate for the location. 2019-12-17
bcd1746caaadfb92999a2ec80553297451e2e4e8f501d76ee917c9155071ce20 notes Permission in place for part demolition of existing buildings and development of 45 apartments (43 net) for 'later living' - 13/02289/FUL. Planning permission has technically been implemented through commencement of site works but the scheme is no longer to be delivered. Extant permission for 43 units. Existing consent for sheltered scheme technically implemented but no longer to be delivered - potential for alternative scheme for redevelopment of town centre site. Previous developer has confirmed that this particular scheme will not be taken forward. Indicative yield considered to reflect a higher density scheme, appropriate given the location, likely to provide flats/apartments. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf 2017-12-17