BLR-5-3
Provenance
1 result
Fields:
notes
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
9cd7346644f63ba4dff3e609113a414200559e434a7b7e282595d759f0cf9488 | notes | Site doesn't benefit from an existing or proposed Local Plan allocation for residential development. 2017 SLAA (ref: SLAA-7-35-C) shows that deliverability has been estimated within a 5-10 year timeframe. Site area of the brownfield land element has been measured separately. (i.e. 0.23 ha and 6 dwellings). | 2017-09-01 |