242d787b7635e8c76c31ec409d3bce3d01e966ccb731992a7e31c7efd8fa4dd0 | notes | student accomodation is currently being constructed on the barbican part of the site and it is likely that the quayside portion 1.7 ha could accommodate a significant number of dwellings at high density if proposed. Flood risk is significant on parts of the site. A residential led Local Development Order for predominantly residential uses with other supporting uses | 2018-12-18 | |
617625c3b7f069dceef55175b8b98e04cf3cab96538c123f8ceeb4bcbd14b8d7 | notes | phase 1 offices are complete | 2020-12-01 | |