Skip to main content
3
Provenance

Filters

Field

1 selected

Field

Clear

2 results

Fields: notes
Fact Field Value Latest Entry Date
05a74dd95fc872cfe516113fd99bca451a9f52521ed29b0b74f6b8979867c0d4 notes Coal mining risk assessment required for technical details application. Canal & River Trust requires the following to be addressed at Technical Details Consent stage: proposed layout and potential canal access, land contamination assessment considering the canal. 2020-06-30
fa851cb52e98d9201dac73a85f530db3b3e4c013161da0d1496f21be144e700d notes Land allocated in Local Plan Part 2 for residential development. Canal & River Trust requires the following to be addressed at Technical Details Consent stage: structural integrity of the retaining wall to the canal, impact on lock nos.52&53 and by-wash, site layout to provide a positive waterside frontage, construction traffic over bridge no. 100 and need for a Construction Management Plan, ecologcial assessment, land contamination & pollution prevention to the canal, towpath improvements. 2017-09-07