Skip to main content
RBR/17/0038
Provenance

Filters

Field

1 selected

Field

Clear

8 results

Fields: notes
Fact Field Value Latest Entry Date
06c1caba021c5e38bd75a4878c89535a0c11abe9a2205fe497d1fdcffab65e65 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13
082a427ebbb97fed2fdc119ebf86dced65341d3af5d077d4bf3ddbdaf804747a notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwelling. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13
3ae319adbd23c75a4d51b25f42506e8f3dfb32dfb93574114ab61bcb3289ccf8 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. 2017-12-13
7a53f8ca15193b09013a6e714f1da3c008a27e50c99931e9c64b796e6ccfa600 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13
80f2895c5cebbb21aa3dcf00f31015ec0ff60d6b805aa5af245be597a2de7e1b notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings 2017-12-13
ace94e8671669bee41b814eaa8d0cb1e8e501d0ff949375cf6c1610ea0c41956 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwelling 2017-12-13
cc075600a6b209f0ddeb99cb769d02d64fec94ea449630669022cacc6c2ddb4b notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land 2017-12-13
da8bf3c6f364c025b23dd3bb398e8b9f1684b39e748450e6d7fdfeddd625bbb8 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13