Fact
f1713da68011532b9c9adf12db8837b83b31c42a82b4c1411718e229a5c8e1dc
f1713da68011532b9c9adf12db8837b83b31c42a82b4c1411718e229a5c8e1dc
|
notes
|
This site was previously split into two areas - the eastern side was proposed for housing and the western side was proposed for commercial development. Each area was subject to separate planning applications but both sites were linked by a S106 agreement. See planning applications RR/2011/901/P (commercial) and RR/2012/1528/P (residential). The residential development was enabling development for the redevelopment of the existing commercial use of the wider site. The residential development is only acceptable as it is enabling the commercial elements at the site. A new scheme (RR/2018/1309/P) has been submitted which combines both of the previous applications and includes the whole site area with a revised layout for the residential and commercial aspects of the development. Under this revised application, the residential part is proposed to the western side and commerical to the eastern side. As the residential development is enabling development, the developer will not be able to implement both of the schemes. Planning application RR/2018/1309/P is pending a decision.. Revised scheme for the redevelopment of the site to provide 6 houses.
|
RDCBLR0037
|
2018-10-01
|
2018-10-01
|
81e0062fc9478965fce3ac9b93f5c166d916f9c88afb2bb794d48253e3ae77fe
|
Resources
81e0062fc9478965fce3ac9b93f5c166d916f9c88afb2bb794d48253e3ae77fe
|