Fact

d3b4c39790ca47d4a96b0c2da355ac5b669c60150244e97238dbf15eb73018dc
Field Value
Fact d3b4c39790ca47d4a96b0c2da355ac5b669c60150244e97238dbf15eb73018dc
Field description
Value Within 3 months of the date of decision, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: Photographic evidence of implementation must be submitted to the Local Planning Authority. 1 x bat box of the Vivaro Pro Build-In Bat Tube type or similar to be located in accordance with instructions from a suitably qualified ecologist. 1x swift box of the integrated WoodStone type or similar to be located in accordance with instructions from a suitably qualified ecologist. Small mammal access holes 13x13cm to be located on two sides in any fencing erected
Entity ecological enhancement sch within 3 mnth
Earliest entry date 2025-02-25
Latest entry date 2025-02-25
Latest resource 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
Resources
Entry Date Resource
2025-02-25 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c