Fact
cbcc6014019499e3859fe8658a58021fa32905b70ce4035a059d471888bcf0b6
cbcc6014019499e3859fe8658a58021fa32905b70ce4035a059d471888bcf0b6
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf
|
RBR/17/0030
|
2017-12-13
|
2017-12-13
|
1138436747ffa57619eefc8532fcdcaa8f9090dab0b4f0c46623246ccaf47cdc
|
Resources
1138436747ffa57619eefc8532fcdcaa8f9090dab0b4f0c46623246ccaf47cdc
|
41bc12729c9f7ff8fbb10dd3e5834e200b216f8f09f6b1d42aeb0fd2246b59f3
|