Fact
cbbd27c8f915794dbc526aa5eaf39682ae18a19eca7cc5097f476e5335b086d9
cbbd27c8f915794dbc526aa5eaf39682ae18a19eca7cc5097f476e5335b086d9
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf
|
RBR/17/0035
|
2017-12-13
|
2017-12-13
|
1138436747ffa57619eefc8532fcdcaa8f9090dab0b4f0c46623246ccaf47cdc
|
Resources
1138436747ffa57619eefc8532fcdcaa8f9090dab0b4f0c46623246ccaf47cdc
|
41bc12729c9f7ff8fbb10dd3e5834e200b216f8f09f6b1d42aeb0fd2246b59f3
|