Skip to main content
RBR/17/0037
Provenance

Filters

Field

1 selected

Field

Clear

9 results

Fields: notes
Fact Field Value Latest Entry Date
45b45420065f680c7c2b7127eec13b4c97c8252c03b109b969f1a2f2871b785c notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. 2017-12-13
505e1b655857fe0c9445f3ab66fb8764f80a04ee78a409b95f9f0bab74837658 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land 2017-12-13
67194c7c67ba02465b59dd06ea236920031755bc2686b0d59d00083b0b852250 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13
6a40ba2219543f74efcb3297c8880989bd48f9717c76e1f29ff59cb4508b7092 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwelling 2017-12-13
7277d5b3b823e643ae3b15730387f8b21bb8371a3482e8a675547a8a8b55f526 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. 2017-12-13
76ac66bba34a1695da60640f6e98ffc73a3770dd0dc3251b5e048bd85362a1d6 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13
7d6166b07630da9066a15afc02e1f14dc79f09602734612c4cbc94f3fa0ecf3a notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwelling. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13
9a3c301f1fdcd14b53cde1f134b54e94d310a307e5fb8515cb16267ca727d4ae notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings 2017-12-13
b3e6f534d9889918079dc68cfd1825b3c50532875011e778dda275d9a5d2ed27 notes The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.. http://richmond.gov.uk/media/15181/lbr-lp-023b-track-changes-to-publication-local-plan-in-progress-v3_171031-lores.pdf 2017-12-13