Fact
9ba1b2140da804fde82a76ce12260ee15c0ef875a095f38eb5ba801a113f3e8b
9ba1b2140da804fde82a76ce12260ee15c0ef875a095f38eb5ba801a113f3e8b
|
notes
|
Amendment of planning conditions 2 (approved plans), to update relevant drawing numbers, and 34 (substations), to provide details and make a compliance condition, to planning permission 2013/3807/P granted on 30th March 2015 (as amended by 2018/0817/P, 2018/1054/P, 2018/2586/P, 2019/1931/P, 2019/3364/P, 2019/4136/P, 2019/0921/P, 2020/3333/P) by the Greater London Authority (for new buildings of 5-15 storeys, 345 dwellings, flexible retail and community floorspace and associated works (summary)). NAMELY to allow the variation of approved drawings to incorporate a re-arrangement of the electrical substation, LW switch room, introduction of a gas intake room at ground floor of Block C, omission of plant at roof level of Blocks B and C, and submission of details for the electrical substation to allow Condition 34 to be amended from a prior to commencement of superstructure works to a compliance condition. Planning application reference: 2021/3338/P. Decision date: 04 November 2021
|
LBCBLR003
|
2023-11-01
|
2024-11-10
|
4675773b67b21d52a4d954995bf1060620dd2ff6be977a87bc524f2ed89848c6
|
Resources
4675773b67b21d52a4d954995bf1060620dd2ff6be977a87bc524f2ed89848c6
|
4dd5a1e9081737effcc3bababbb84f2849eb4f7e2130fa049029b63e32d2d64b
|
77e98fdc2bf87e8ffa3fca4ec9c70ee1ee69d45bf5035a015c5f112754fe7a89
|
88c5584cdefd35b961540f1824fc3f641e10d99d17cdd0b307562ca638890d48
|
9e4f144fdbba092e535e13a6807f78c8e1fdf377798f00b0e911bc13a3a7f98f
|
ac71d5a27d45da9336c8ba8bccbe4bfece7fe74e2df438a236d40a401c1b7911
|
b18209b4513c8f8908706e7dc85fc475d4392403d3dea3c3429b5d7d9daaf0c5
|
d983f99064158ed4a0ef3d228d3dbafb1c902697c5f7f403afe3df86f74c3137
|
eaefa195dee9da7bf7dc28a52380fbe6b2831746ae5301f538bc58659ee22fe1
|
ef40cc8c0efc2b587bc9a9246958018e226e648deb395daed66f8ff5b102aefc
|