Fact
8911d9d5b52673c13ea1d67b17af7c30372b6c7456a8a5af32178cc74d6d62bc
8911d9d5b52673c13ea1d67b17af7c30372b6c7456a8a5af32178cc74d6d62bc
|
description
|
Development on any land during a period not exceeding 28 consecutive days consisting of– (a)the drilling of boreholes; (b)the carrying out of seismic surveys; or (c)the making of other excavations, for the purpose of mineral exploration, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those operations.
|
Mineral exploration
|
2024-03-26
|
2024-03-27
|
86611a73da35d11cf63230e75bf600ed8386eb1372cfbad704595a7dcc6b2694
|
Resources
86611a73da35d11cf63230e75bf600ed8386eb1372cfbad704595a7dcc6b2694
|
ae2e4bbadda50a227712436158814ed60caffa22d987f24aacbd0ac2ab529b46
|
bf83c948bf1997dc4aac377c7dc32c8b3e6ff5002b5652bbf519d02e47a6fee7
|