Fact

3d008d585fb9eb915ce73b405fef80df2dee9019b3e8a64d99c3b9833517bf15
Field Value
Fact 3d008d585fb9eb915ce73b405fef80df2dee9019b3e8a64d99c3b9833517bf15
Field description
Value Development for the purposes of their undertaking by statutory undertakers for the supply of water or hydraulic power consisting of: (a) development not above ground level required in connection with the supply of water or for conserving, or for the conveyance of water treatment sludge; (b) development in, (c) the provision of a building, machinery or apparatus in, on, over or under land for the purpose of survey or investigation; (d) the maintenance, (e) the installation in a water distribution system of a booster station, meter or switch-gear house; (f) any works authorised by or required in connection with an order made under section 73 of the Water Resources Act 1991 (power to make ordinary and emergency drought orders)(55); (g) any other development in, over or under operational land other than the provision of a building but including the extension or alteration of a building.
Entity Water or hydraulic power undertakings
Earliest entry date 2020-12-31
Latest entry date 2020-12-31
Latest resource 36ed5f13e3d37cdc5808ce5fe9bcd73b7a65cf04cf2e6ecd36477d88c1a2eef6
Resources
Entry Date Resource
2020-12-31 36ed5f13e3d37cdc5808ce5fe9bcd73b7a65cf04cf2e6ecd36477d88c1a2eef6
2020-12-31 86611a73da35d11cf63230e75bf600ed8386eb1372cfbad704595a7dcc6b2694
2020-12-31 ae2e4bbadda50a227712436158814ed60caffa22d987f24aacbd0ac2ab529b46
2020-12-31 bf83c948bf1997dc4aac377c7dc32c8b3e6ff5002b5652bbf519d02e47a6fee7
2020-12-31 c6a8ea056065e65725671b5405c0a4a1e1473d2c01374198fb37edbe05779f67
2020-12-31 ff0afb2fe819469b2718da7b35db4f0cf23456d17b5fb3835baba49a68c7957e