Fact
040a5a222ac8e371e09909c3f02313f7dab97979eafadb0da6f70d832c41b8f5
040a5a222ac8e371e09909c3f02313f7dab97979eafadb0da6f70d832c41b8f5
|
description
|
Development on any land during a period not exceeding 28 consecutive days consisting of: (a) the drilling of boreholes; (b) the carrying out of seismic surveys; or (c) the making of other excavations, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those operations
|
Temporary use of land etc for mineral exploration
|
2020-12-31
|
2020-12-31
|
36ed5f13e3d37cdc5808ce5fe9bcd73b7a65cf04cf2e6ecd36477d88c1a2eef6
|
Resources
36ed5f13e3d37cdc5808ce5fe9bcd73b7a65cf04cf2e6ecd36477d88c1a2eef6
|
86611a73da35d11cf63230e75bf600ed8386eb1372cfbad704595a7dcc6b2694
|
ae2e4bbadda50a227712436158814ed60caffa22d987f24aacbd0ac2ab529b46
|
bf83c948bf1997dc4aac377c7dc32c8b3e6ff5002b5652bbf519d02e47a6fee7
|
c6a8ea056065e65725671b5405c0a4a1e1473d2c01374198fb37edbe05779f67
|
ff0afb2fe819469b2718da7b35db4f0cf23456d17b5fb3835baba49a68c7957e
|