Design code rule

R1.19

Field Value Fact links
Reference R1.19 Facts
Prefix design-code-rule Facts
Name Facts
Dataset Design code rule no fact link
Organisation Essex County Council no fact link
Start date no fact link
End date no fact link
Entry date 2024-06-11 Facts
Typology policy no fact link
Description To prepare for national future homes standards due to be implemented in 2025, all new homes are strongly encouraged to be ‘gas free’ such as through use of air source or ground source heat pumps or connection to a district heat network. Facts
Design code uttlesford-design-code Facts
Document url https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/ Facts
Documentation url https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/ Facts

Contents

{
    "reference": "R1.19",
    "prefix": "design-code-rule",
    "name": "",
    "dataset": "design-code-rule",
    "organisation-entity": "133",
    "start-date": "",
    "end-date": "",
    "entry-date": "2024-06-11",
    "typology": "policy",
    "geometry": "",
    "point": "",
    "entity": 8700950,
    "description": "To prepare for national future homes standards due to be implemented in 2025, all new homes are strongly encouraged to be \u2018gas free\u2019 such as through use of air source or ground source heat pumps or connection to a district heat network.",
    "design-code": "uttlesford-design-code",
    "document-url": "https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/",
    "documentation-url": "https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/"
}

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.