Planning condition

CEMP EA

Field Value Fact links
Reference U0109211 Facts
Prefix planning-condition Facts
Name CEMP EA Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To ensure that there are no detrimental impacts to flood storage or flood flow routes and to ensure the structural integrity of the existing flood defences thereby reducing the risk of flooding Facts
Description The development hereby permitted must not be commenced until such time as a Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing by, the local planning authority. This plan should: - ensure no raising of ground levels within the flood storage area - provide details of the cable construction/installation methods The scheme CEMP shall be fully implemented and subsequently maintained, in accordance with the scheme's timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority. Facts

Contents

{
    "reference": "U0109211",
    "prefix": "planning-condition",
    "name": "CEMP EA",
    "dataset": "planning-condition",
    "organisation-entity": "109",
    "start-date": "",
    "end-date": "",
    "entry-date": "2025-02-25",
    "typology": "policy",
    "geometry": "",
    "point": "",
    "entity": 73000414,
    "notes": "Unique Condition",
    "reason": "To ensure that there are no detrimental impacts to flood storage or flood flow routes and to ensure the structural integrity of the existing flood defences thereby reducing the risk of flooding",
    "description": "The development hereby permitted must not be commenced until such time as a Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing by, the local planning authority. This plan should: - ensure no raising of ground levels within the flood storage area - provide details of the cable construction/installation methods The scheme CEMP shall be fully implemented and subsequently maintained, in accordance with the scheme's timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority."
}

© Crown copyright and database right 2025