Planning condition
CEMP EA
Field | Value | Fact links |
---|---|---|
Reference | U0109211 | Facts |
Prefix | planning-condition | Facts |
Name | CEMP EA | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Notes | Unique Condition | Facts |
Reason | To ensure that there are no detrimental impacts to flood storage or flood flow routes and to ensure the structural integrity of the existing flood defences thereby reducing the risk of flooding | Facts |
Description | The development hereby permitted must not be commenced until such time as a Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing by, the local planning authority. This plan should: - ensure no raising of ground levels within the flood storage area - provide details of the cable construction/installation methods The scheme CEMP shall be fully implemented and subsequently maintained, in accordance with the scheme's timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority. | Facts |
Contents
{
"reference": "U0109211",
"prefix": "planning-condition",
"name": "CEMP EA",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000414,
"notes": "Unique Condition",
"reason": "To ensure that there are no detrimental impacts to flood storage or flood flow routes and to ensure the structural integrity of the existing flood defences thereby reducing the risk of flooding",
"description": "The development hereby permitted must not be commenced until such time as a Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing by, the local planning authority. This plan should: - ensure no raising of ground levels within the flood storage area - provide details of the cable construction/installation methods The scheme CEMP shall be fully implemented and subsequently maintained, in accordance with the scheme's timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority."
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.