Planning condition

CTMP

Field Value Fact links
Reference U0108814 Facts
Prefix planning-condition Facts
Name CTMP Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason In order to mitigate the impact of construction traffic generated by the development. Facts
Description A Construction Traffic Management Plan (CTMP) shall be submitted to and approved by the local planning authority before works commence on each phase of development on the site. The CTMP shall contain information relating to (but not limited to): Volumes and types of construction vehicles Identification of delivery routes Identification of agreed access point Contractor's method for controlling construction traffic and adherence to routes Size, route and numbers of abnormal loads Swept path analysis (as required) Construction Period Temporary signage Measures to control mud and dust being transferred to the public highway Timing of deliveries Construction shall thereafter be carried out in accordance with the CTMP. Facts

Contents

{
    "reference": "U0108814",
    "prefix": "planning-condition",
    "name": "CTMP",
    "dataset": "planning-condition",
    "organisation-entity": "109",
    "start-date": "",
    "end-date": "",
    "entry-date": "2025-02-25",
    "typology": "policy",
    "geometry": "",
    "point": "",
    "entity": 73000329,
    "notes": "Unique Condition",
    "reason": "In order to mitigate the impact of construction traffic generated by the development.",
    "description": "A Construction Traffic Management Plan (CTMP) shall be submitted to and approved by the local planning authority before works commence on each phase of development on the site. The CTMP shall contain information relating to (but not limited to): Volumes and types of construction vehicles Identification of delivery routes Identification of agreed access point Contractor's method for controlling construction traffic and adherence to routes Size, route and numbers of abnormal loads Swept path analysis (as required) Construction Period Temporary signage Measures to control mud and dust being transferred to the public highway Timing of deliveries Construction shall thereafter be carried out in accordance with the CTMP."
}

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.