Planning condition
CTMP
Field | Value | Fact links |
---|---|---|
Reference | U0108814 | Facts |
Prefix | planning-condition | Facts |
Name | CTMP | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Notes | Unique Condition | Facts |
Reason | In order to mitigate the impact of construction traffic generated by the development. | Facts |
Description | A Construction Traffic Management Plan (CTMP) shall be submitted to and approved by the local planning authority before works commence on each phase of development on the site. The CTMP shall contain information relating to (but not limited to): Volumes and types of construction vehicles Identification of delivery routes Identification of agreed access point Contractor's method for controlling construction traffic and adherence to routes Size, route and numbers of abnormal loads Swept path analysis (as required) Construction Period Temporary signage Measures to control mud and dust being transferred to the public highway Timing of deliveries Construction shall thereafter be carried out in accordance with the CTMP. | Facts |
Contents
{
"reference": "U0108814",
"prefix": "planning-condition",
"name": "CTMP",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000329,
"notes": "Unique Condition",
"reason": "In order to mitigate the impact of construction traffic generated by the development.",
"description": "A Construction Traffic Management Plan (CTMP) shall be submitted to and approved by the local planning authority before works commence on each phase of development on the site. The CTMP shall contain information relating to (but not limited to): Volumes and types of construction vehicles Identification of delivery routes Identification of agreed access point Contractor's method for controlling construction traffic and adherence to routes Size, route and numbers of abnormal loads Swept path analysis (as required) Construction Period Temporary signage Measures to control mud and dust being transferred to the public highway Timing of deliveries Construction shall thereafter be carried out in accordance with the CTMP."
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.