BL8
Field | Value | Fact links |
---|---|---|
Reference | BL8 | Facts |
Prefix | brownfield-land | Facts |
Name | BL8 | Facts |
Dataset | Brownfield land | no fact link |
Organisation | East Devon District Council | no fact link |
Start date | 2016-05-17 | no fact link |
End date | no fact link | |
Entry date | 2020-12-07 | Facts |
Typology | geography | no fact link |
Point |
POINT (-3.283934 50.749288)
|
Facts |
Notes | Part of a Floodzone 2; townhouses under construction and building work started on car park and the conversion of the old switchgear factory. As of December 2020, there have been 17 completions in Town Mill Regeneration Area 1 and zero completions in Areas 2 & 3.. Redevelopment of parcels of land making up the overall former Cuttler Hammer factory site and Tumbling Weir hotel car park; comprising conversion of building to 30 apartments, construction of 33 new dwellings and 29 retirement apartments. | Facts |
Hectares | 1.73 | Facts |
Deliverable | yes | Facts |
Site address | Land and Buildings at Former Cuttler Hammer Factory and Tumbling Weir Hotel Car Park, Ottery St Mary | Facts |
Site plan url | http://eastdevon.gov.uk/planning/planning-policy/housing-issues/brownfield-land/brownfield-site/?long=-3.283934&lat=50.749288 | Facts |
Ownership status | not owned by a public authority | Facts |
Maximum net dwellings | 92 | Facts |
Planning permission date | 2014-08-19 | Facts |
Planning permission type | full planning permission | Facts |
Planning permission status | permissioned | Facts |
Planning permission history | https://planning.eastdevon.gov.uk/online-applications/applicationDetails.do?activeTab=details&keyVal=MFA5GLGH09100|https://planning.eastdevon.gov.uk/online-applications/applicationDetails.do?activeTab=details&keyVal=MFA5IFGH09100|https://planning.eastdevon.gov.uk/online-applications/applicationDetails.do?activeTab=details&keyVal=O0WK5KGHHP100 | Facts |
Available Code Snippets:
{
"reference": "BL8",
"prefix": "brownfield-land",
"name": "BL8",
"dataset": "brownfield-land",
"organisation-entity": "119",
"start-date": "2016-05-17",
"end-date": "",
"entry-date": "2020-12-07",
"typology": "geography",
"geometry": "",
"point": "POINT (-3.283934 50.749288)",
"entity": 1706368,
"notes": "Part of a Floodzone 2; townhouses under construction and building work started on car park and the conversion of the old switchgear factory. As of December 2020, there have been 17 completions in Town Mill Regeneration Area 1 and zero completions in Areas 2 & 3.. Redevelopment of parcels of land making up the overall former Cuttler Hammer factory site and Tumbling Weir hotel car park; comprising conversion of building to 30 apartments, construction of 33 new dwellings and 29 retirement apartments.",
"hectares": "1.73",
"deliverable": "yes",
"site-address": "Land and Buildings at Former Cuttler Hammer Factory and Tumbling Weir Hotel Car Park, Ottery St Mary",
"site-plan-url": "http://eastdevon.gov.uk/planning/planning-policy/housing-issues/brownfield-land/brownfield-site/?long=-3.283934&lat=50.749288",
"ownership-status": "not owned by a public authority",
"maximum-net-dwellings": "92",
"planning-permission-date": "2014-08-19",
"planning-permission-type": "full planning permission",
"planning-permission-status": "permissioned",
"planning-permission-history": "https://planning.eastdevon.gov.uk/online-applications/applicationDetails.do?activeTab=details&keyVal=MFA5GLGH09100|https://planning.eastdevon.gov.uk/online-applications/applicationDetails.do?activeTab=details&keyVal=MFA5IFGH09100|https://planning.eastdevon.gov.uk/online-applications/applicationDetails.do?activeTab=details&keyVal=O0WK5KGHHP100"
}
Loading...
© Crown copyright and database right 2024
Licensed under the Open Government Licence v.3.0.