Infrastructure project

Able Marine Energy Park Material Change 1

Field Value Fact links
Reference TR030005 Facts
Prefix infrastructure-project Facts
Name Able Marine Energy Park Material Change 1 Facts
Dataset Infrastructure project no fact link
Organisation Planning Inspectorate no fact link
Start date no fact link
End date no fact link
Entry date 2023-09-29 Facts
Typology geography no fact link
Point POINT (-0.218902 53.6501) Facts
Documentation url https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/able-marine-energy-park-material-change-1/ Facts
Infrastructure project type transport Facts
Infrastructure project decision Pre Application Facts

Available Code Snippets:

{
    "reference": "TR030005",
    "prefix": "infrastructure-project",
    "name": "Able Marine Energy Park Material Change 1",
    "dataset": "infrastructure-project",
    "organisation-entity": "14",
    "start-date": "",
    "end-date": "",
    "entry-date": "2023-09-29",
    "typology": "geography",
    "geometry": "",
    "point": "POINT (-0.218902 53.6501)",
    "entity": 11100000051,
    "documentation-url": "https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/able-marine-energy-park-material-change-1/",
    "infrastructure-project-type": "transport",
    "infrastructure-project-decision": "Pre Application"
}
Loading...

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.

Geographical area


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.