Infrastructure project

Able Marine Energy Park Material Change 1

Field Value Fact links
Reference TR030005 Facts
Prefix infrastructure-project Facts
Name Able Marine Energy Park Material Change 1 Facts
Dataset Infrastructure project no fact link
Organisation Planning Inspectorate no fact link
Start date no fact link
End date no fact link
Entry date 2023-09-29 Facts
Typology geography no fact link
Point POINT (-0.218902 53.6501) Facts
Documentation url https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/able-marine-energy-park-material-change-1/ Facts
Infrastructure project type Transport Facts
Infrastructure project decision Pre Application Facts

Available Code Snippets:

{
    "reference": "TR030005",
    "prefix": "infrastructure-project",
    "name": "Able Marine Energy Park Material Change 1",
    "dataset": "infrastructure-project",
    "organisation-entity": "14",
    "start-date": "",
    "end-date": "",
    "entry-date": "2023-09-29",
    "typology": "geography",
    "geometry": "",
    "point": "POINT (-0.218902 53.6501)",
    "entity": 11010000204,
    "documentation-url": "https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/able-marine-energy-park-material-change-1/",
    "infrastructure-project-type": "Transport",
    "infrastructure-project-decision": "Pre Application"
}
Loading...

© Crown copyright and database right 2024

Licensed under the Open Government Licence v.3.0.

Geographical area