Planning condition

CTMP

Field Value Fact links
Reference U0112152 Facts
Prefix planning-condition Facts
Name CTMP Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason In the interests of road safety in accordance with Local Plan Policy 13. Facts
Description Development shall not commence until Construction Traffic Management Plan (CTMP) for that phase of development is submitted to and subsequently approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. I would expect the CTMP to contain information relating to (but not limited to): o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Measures to control mud and dust being transferred to the public highway o Timing of deliveries Facts

Contents

{
    "reference": "U0112152",
    "prefix": "planning-condition",
    "name": "CTMP",
    "dataset": "planning-condition",
    "organisation-entity": "109",
    "start-date": "",
    "end-date": "",
    "entry-date": "2025-02-25",
    "typology": "policy",
    "geometry": "",
    "point": "",
    "entity": 73001023,
    "notes": "Unique Condition",
    "reason": "In the interests of road safety in accordance with Local Plan Policy 13.",
    "description": "Development shall not commence until Construction Traffic Management Plan (CTMP) for that phase of development is submitted to and subsequently approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. I would expect the CTMP to contain information relating to (but not limited to): o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Measures to control mud and dust being transferred to the public highway o Timing of deliveries"
}

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.