Able Marine Energy Park Material Change 2
Field | Value | Fact links |
---|---|---|
Reference | TR030006 | Facts |
Prefix | infrastructure-project | Facts |
Name | Able Marine Energy Park Material Change 2 | Facts |
Dataset | Infrastructure project | no fact link |
Organisation | Planning Inspectorate | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2023-09-29 | Facts |
Typology | geography | no fact link |
Point |
POINT (-0.221914 53.654047)
|
Facts |
Documentation url | https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/able-marine-energy-park-material-change-2/ | Facts |
Infrastructure project type | Transport | Facts |
Infrastructure project decision | Decided | Facts |
Available Code Snippets:
{
"reference": "TR030006",
"prefix": "infrastructure-project",
"name": "Able Marine Energy Park Material Change 2",
"dataset": "infrastructure-project",
"organisation-entity": "14",
"start-date": "",
"end-date": "",
"entry-date": "2023-09-29",
"typology": "geography",
"geometry": "",
"point": "POINT (-0.221914 53.654047)",
"entity": 11010000205,
"documentation-url": "https://infrastructure.planninginspectorate.gov.uk/projects/yorkshire-and-the-humber/able-marine-energy-park-material-change-2/",
"infrastructure-project-type": "Transport",
"infrastructure-project-decision": "Decided"
}
Loading...
© Crown copyright and database right 2024
Licensed under the Open Government Licence v.3.0.